IC 2698 leads train O998 onto the single track at Hargwen.
CN's TEST equipment accelerates eastward on the Edson Sub behind IC C44-9W 2698. Today an Amtrak Superliner sleeper is along for the ride which is providing the onboard crew sleeping arrangements ... (more)
IC C44-9W 2698 is more than enough power on this day, leading CN's TEST equipment into Jasper for a crew change. For possibly the first time ever, an Amtrak Superliner makes an appearance in Alber... (more)